Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts
Friday, 11 November 2016
Wednesday, 9 November 2016
Tuesday, 8 November 2016
Tuesday 8th November - Editing
This is our Final attempt at editing everything all together. The deadline is at the end of the week and all we have to do is finished editing Matt into the video. His performance is amazing and I'm so relieved that we got him to do this for us.
Monday, 7 November 2016
Album Front Cover Inspiration
Since getting back our feedback on our Ancillary texts, and also having to change the images for the Ancillary texts due to a change in performer I have been trying to think of an idea for my front cover. I feel like if I get my front cover idea sorted the rest will be easier to imagine. I decided to look at some already existing album covers and came across these:
I love the idea of having text blocking the face from view, especially the Halsey album cover. I want to re-create this for my Front cover.
Friday, 4 November 2016
Friday 4th November - Filming
Today, was out last ditch effort at getting a male performer in our video. Chloe and I brought in our friend, Matt, who we know we can trust as he has been in every single media product Chloe and I have made since GCSE. He was amazing. Its like the biggest weight has lifted off my shoulders, his performance was so convincing and he knew every line. He put so much more effort into than Tom did.
Tuesday, 1 November 2016
Thursday, 27 October 2016
Friday, 14 October 2016
First Draft of Digipak


I have chosen to do two seperate digipaks. This is because even though I like the edited one I'm unsure if I like it enough to have it as my Digipak, I wanted to post it to show my progress and all my ideas. I am still unsure if I prefer the unmanipulated digipak or the edited version.
Friday, 7 October 2016
Thursday, 6 October 2016
Thursday 6th October - Editing
For the first half of our lesson today, Chloe and I continued to edit more shots together, moving the sequences around to make it flow better. The shots we have taken work realy well together, it flows well and looks quite natural. The section when it lists off all the factors of a relationship, our shots fit really well, and while they don't match the lyrics as much as we had initially wanted, i feel that it looks better this way. In the second half of the lesson we went into the studio and filmed some performance shots of me. While we know that the singer in the band is male, we did use me as the performer because there was an inpending deadline, and we wanted to have the shots in our video to at least see what it looks like.
Tuesday, 4 October 2016
Tuesday 4th October - Editing
Today, Chloe and I rewatched the small section we had edited in the friday lesson, and still hated it. The sequence was a series of shots with me and then a series of shots with Tom, it didnt flow, it looked odd. We decided to move some shots around, to make the sequence look and flow better. We then started to add in our shots for the chorus sequence and other section of the song.
Tuesday 4th October - Editing
Today, Chloe and I rewatched the small section we had edited in the friday lesson, and still hated it. The sequence was a series of shots with me and then a series of shots with Tom, it didnt flow, it looked odd. We decided to move some shots around, to make the sequence look and flow better. We then started to add in our shots for the chorus sequence and other section of the song.
Friday, 30 September 2016
Friday 30th September - Editing
Today we only had a single lesson in Media, so we knew we didnt have time to carry on filming so we started editing the begining sequence of our music video, I think the sequence looks wrong, there is something about it that I really hate. I'm sure I will like it better after we have finished it, though I feel we should reconsider the placement of some shots.
Thursday 29th September 2016 - Filming
Wednesday, 28 September 2016
Wednesday 28th September 2016 - Filming
Tuesday, 27 September 2016
Tuesday 27th September 2016 - Filming
Chloe and I started to film our music video today. Our male actor Tom was unavailable due to him being at work, so Chloe and I filmed shots that only I was in so we wouldn't have to do this at a later date. I live very close to Toton sidings, which is a location with lots of trees and nature, and filmed our first shots up there. This filming process made me more confident about our music video, as I was quite impressed the shots we had taken. Chloe took control of the filming as I was staring in the video but we both shared ideas throughout filming, and gave opinions on shots.
Subscribe to:
Posts (Atom)